RENOVATIONS & FINISHING · THROUGHOUT THE NETHERLANDS+48 607 060 387 ↗
MGS-BUDMGS-BUDRENOVATIONS & FINISHING

MGS-BUD / FLOORING AND SKIRTING

A floor that brings the room together.

The laying pattern, a level base and neatly fitted skirting create the finished result. We plan preparation, the selected flooring system and junctions at doors and adjoining rooms.

Your scope and measurements are the starting point. We agree labour and materials separately.

Interior inspiration image — this is not an MGS-BUD project.
Interior inspiration image — this is not an MGS-BUD project.
Scope before priceFirst, we agree what needs to be done.
Materials separatelyWe agree who buys and supplies the materials.
Your own photosYou can attach photos of the renovation area.

01 / DEFINE THE WORK

What we can plan.

We match the scope to the existing room. We confirm the final solution and cost before work starts.

  • Review of the accessible substrate and required preparation.
  • Removal of existing flooring when included in the scope.
  • Levelling or underlay to match the agreed system.
  • Installation of selected laminate, boards or PVC.
  • Cutting around walls, door frames and obstacles.
  • Skirting, thresholds and junctions between rooms.

02 / PREPARE YOUR MEASUREMENTS

A little information. A better estimate.

  • Each room’s floor area and a layout sketch.
  • Existing floor type and photos of the substrate.
  • Selected product and glued or floating installation.
  • Skirting length, thresholds, stairs and any underfloor heating.

03 / FROM FIRST CONTACT TO HANDOVER

Clear agreements at each stage.

  1. Photos and scope

    Describe your desired result, the current room and your preferred dates.

  2. Measurements and offer

    We agree surfaces, materials, access and any additional work.

  3. Agreed installation

    We confirm the scope and work sequence. Changes are agreed before carrying them out.

  4. Handover

    We check the completed scope and discuss ongoing use and care.

04 / GOOD TO KNOW

Questions before renovating.

Does herringbone cost the same as straight laying?

The patterns require different cuts and working time. Specify the pattern and product so the offer covers the correct installation method.

Does the quote include levelling the base?

Only when it is included in the scope. We determine levelling needs and materials after checking the substrate.

How do I calculate skirting?

Measure the wall lengths needing skirting and subtract openings where it will not be fitted. Room dimensions help establish an initial quantity.

LET’S DISCUSS YOUR RENOVATION

Show us what you want to change.

Send an enquiry directly from this page. Include your town, work scope and preferred dates so we can discuss the next steps.

Enter an email address or phone number so we can reply.

The app saves public website files to work offline. Submitting saves your contact details and uploaded photos at MGS-BUD to handle your enquiry. A form draft may be saved on this device; you can delete it.